All templates
DatabaseOfficial

Risikoregister

Project risks with likelihood, impact, a calculated risk score, mitigation, owner and status.

Download2 KB

1 downloads · opened 0× in Flowplan

Risk register

Spot risks early and manage them deliberately.

  • likelihood and impact 1–5 each, a formula calculates the risk score
  • strategy (avoid, reduce, transfer, accept), mitigation, owner, status
  • views: by risk score, a board by status, a chart per category

Review the top 5 in the regular project meeting; from a score of 15 a risk belongs in the status report.

This template comes with Flowplan and is in the public domain (CC0). Its content is in German.

Contents

9 properties, 3 views, 4 example rows

Versions

  1. Version 1 · 12 Nov 2026 · Flowplan ≥ 0.9.4
    Download